<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>GridPass blog</title><link>https://gridpass.co/blog/</link><description>Practical engineering notes on grid connections, on-site power and site power control.</description><language>en-gb</language><atom:link href="https://gridpass.co/blog/rss.xml" rel="self" type="application/rss+xml" />
<item><title>Your grid connection has conditions. Gridpass does the engineering.</title><link>https://gridpass.co/blog/flexible-grid-connection-controls/</link><guid isPermaLink="true">https://gridpass.co/blog/flexible-grid-connection-controls/</guid><pubDate>Thu, 12 Nov 2026 09:00:00 GMT</pubDate><description>Need to operate within a constrained or flexible grid connection? Gridpass assesses your site, integrates the controls, tests the response and documents the results.</description></item>
<item><title>What is a flexible grid connection? A plain guide for site owners</title><link>https://gridpass.co/blog/what-is-a-flexible-grid-connection/</link><guid isPermaLink="true">https://gridpass.co/blog/what-is-a-flexible-grid-connection/</guid><pubDate>Thu, 12 Nov 2026 09:00:00 GMT</pubDate><description>A flexible grid connection gives a site capacity sooner, on the condition that the network operator can limit it at certain times. Here is what that means in practice.</description></item>
<item><title>How to get more grid capacity for a factory: seven options when the grid is full</title><link>https://gridpass.co/blog/more-grid-capacity-for-a-factory/</link><guid isPermaLink="true">https://gridpass.co/blog/more-grid-capacity-for-a-factory/</guid><pubDate>Thu, 12 Nov 2026 09:00:00 GMT</pubDate><description>When a factory needs more power and the network has none to give, there are still seven routes to check. Start with the ones that need no new connection.</description></item>
<item><title>Peak shaving against a grid import limit: battery, loads and controls</title><link>https://gridpass.co/blog/peak-shaving-against-a-grid-import-limit/</link><guid isPermaLink="true">https://gridpass.co/blog/peak-shaving-against-a-grid-import-limit/</guid><pubDate>Thu, 12 Nov 2026 09:00:00 GMT</pubDate><description>Holding a grid import limit is harder than cutting a bill. This guide covers how to size the battery, which loads to use and what the controls must do.</description></item>
</channel></rss>
