Protected loads
NO CURTAILMENTEssential site load stays powered.
FLEXIBLE CONNECTION CONTROL
See how a site can respond to an import limit. The same control order applies to data centres and factories: battery first, then approved site loads, then operator-owned workloads that have opted in. Protected loads stay on.
20 MW modelled connection
Interactive simulation. Site values and control response are modelled. No physical equipment is connected. The log is simulation data.
Model notesEssential site load stays powered.
3 MW / 0.5 MWh. 25% illustrative reserve.
Candidate loads depend on site review.
Only workloads approved by the site owner.
Load reduction and battery discharge contribute separately.
A higher ceiling permits recovery; it does not force consumption. Deferred work can increase demand after a reduction.
REGULATORY PATH
Article 6a of Directive (EU) 2024/1711 sets a framework for flexible connection agreements where new capacity is limited. The directive states that a system user connecting through a flexible grid connection must install a power control system certified by an authorised certifier. GridPass is not certified. Certification is a planned product and regulatory workstream.
Article 6a requires a certified power control system for users connecting through a flexible agreement. GridPass is working towards this requirement. Directive (EU) 2024/1711, Article 6a ↗
SITE ASSESSMENT
Review the connection terms, load data and approved control scope with the GridPass team.
For the AI data-centre preset, the opt-in workload response uses published A100 curves from an open demonstration dataset. The curves are not site measurements and do not predict another GPU, workload or facility. The model profile is labelled synthetic. A calibrated European site profile can be added as a separate profile when measured data is available.
Factory preset: 6 MW connection, 4 MW firm fallback, 3 MW protected process line, 1.5 MW candidate flexible site load, 0.5 MW opt-in workload, 1 MW / 2 MWh battery, 20% reserve. Values are illustrative, not measured. Candidate loads include compressed air, chillers, HVAC, furnaces and fleet charging, subject to engineering review.
Model order: battery, approved flexible site loads, then operator-owned opt-in workloads. Protected process loads and third-party tenant loads are not curtailed. The log shown here is model output. A deployed system would need agreed measurement, control permissions, site safety review and validation before producing a record for the site and grid operator.
Software simulation · no live equipment I/O