Capacity has conditions
Flexible capacity can depend on the network operator, contract, location and time of use.
Data centres · Flexible connections
GridPass helps data-centre teams assess flexible capacity, plan how the site can respond and build clear evidence of operation.
Physical integration and operator acceptance depend on each site and its agreements.
The problem
A connection limit can make more power available, but only if the operator can meet the agreed limits and show what happened.
Flexible capacity can depend on the network operator, contract, location and time of use.
Batteries, approved site loads and operator-owned opt-in workloads have different limits, response times and operating priorities.
A site needs reliable measurements and records to review its response with the network operator.
How it works
Each step checks the site, its permissions and the evidence needed before moving to the next one.
Review the connection terms, site load profile and available flexible assets.
Compare site meter data with the expected response. Start read-only.
Define safe limits, operating priorities and a supervised test plan.
If approved, test bounded control and produce an event report.
What you get
The scope depends on the site data, connection terms, asset access and operator requirements.
Estimate how much flexibility the site can offer, for how long and under what limits.
Map approved batteries and flexible loads to the connection limit and operating priorities.
Set out data access, safety checks, test stages and a route to local control.
Report the measured site response against each agreed event and limit.
Start a conversation
Share the site details you have. We will reply with a clear next step.
Available options depend on your location, site demand and network terms.