Your power need
Current contracted capacity, demand peaks and new loads define the size of the problem.
Free first site review
Tell us where your site is, how much power you have and how much you need. We review the information and identify grid connection options worth investigating.
GridPass is a site assessment, not a connection permit. The network operator decides capacity and terms.
The problem
A grid connection request is only one part of the decision. Start with what your site needs and what information is available.
Current contracted capacity, demand peaks and new loads define the size of the problem.
Grid operator rules, local capacity and the site connection determine which routes can be considered.
Batteries and approved flexible loads may help, but their costs and operating limits must be assessed.
How it works
The first review is based on information you provide. We identify open questions rather than assume grid approval.
Provide the site country and location, current capacity, planned power need and target date.
We check the available connection and load data, including important missing information.
We consider conventional or flexible connection routes and site-side peak management where relevant.
Receive a short initial review and a checklist for the operator or a deeper technical study.
What you get
A first assessment for European factories, data centres and other large electricity users.
Your stated connection limit, additional power requirement and key assumptions.
Potential capacity-request, flexible-connection or site-control routes, subject to local terms.
Information needed from your team or network operator before a decision.
A clear route for further study or an operator discussion, without a guarantee of capacity.
Start a conversation
Share the site details you have. We will reply with a clear next step.
Available options depend on your location, site demand and network terms.