GridPass
Energy optimisationFactoriesData centresGrid accessSimulation
More ▾
Site powerOn-site powerLoad balancingFor grid operatorsHow we workToolsGlossaryBlog
Get your GridPass
Energy optimisationSite powerFactoriesData centresOn-site powerLoad balancingGrid accessSimulationFor grid operatorsHow we workToolsGlossaryBlogContact

Tools

Put numbers on your grid problem.

Free calculators and simulations. They run in your browser and nothing is sent until you choose to contact us.

Calculator

Cost of grid connection delay

What waiting for a firm connection costs, and what an earlier start with a flexible connection or on-site power would be worth.

Open →
Calculator

Peak and capacity check

How far your site is over or under its grid limit, with a first battery size to hold the limit.

Open →
Simulation

Flexible connection simulation

Apply a grid limit to a data centre or a factory and watch battery and loads respond.

Open →
Replay

One year against a limit

A year of real data-centre demand replayed against a flexible connection.

Open →
Case study

Data-centre study

An illustrative digital twin with sizing, evidence log and the early-connection business case.

Open →
Reference

Grid connection glossary

Plain definitions of the terms in a connection offer.

Open →
© 2026 GridPassEnergy optimisation · Site power · Factories · Data centres · On-site power · Load balancing · Grid access · Grid operators · Interactive simulation · How we work · Tools · Glossary · Blog · Brand assets · Privacy · Contact