Calculator · Flexible grid connections
How much flexibility do you need?
Enter your power demand, available grid power and the duration of a restriction. See how much flexibility you need. Add equipment only if you know what is available.
Result
Indicative screening only. Assumes constant load and the event and equipment settings entered. Not a connection approval or Flex MOSAIC certification.
Send this scenario for a free reviewHow it is calculated
A transparent first-pass assessment.
- Required reduction = site demand minus the event import limit, floored at zero.
- Only count generation and approved flexible loads that can respond within the notice period and sustain the full event.
- Limit battery discharge by its MW rating, usable MWh divided by event duration, and energy that can be restored before the next event.
- Allocate sustained power in ascending variable cost until the required reduction is met or available resources are exhausted.
- Calculate uncovered power, import during the event, annual event hours, recharge duration and annual modeled variable cost. Annual cost excludes capital and fixed costs.
- The notice, duration and annual utilisation inputs follow the dimensions described in EPRI Flex MOSAIC. This tool does not assign an official flexibility class.