Calculator · Flexible grid connections

How much flexibility do you need?

Enter your power demand, available grid power and the duration of a restriction. See how much flexibility you need. Add equipment only if you know what is available.

Your numbers

Add existing equipment (optional)

Leave at zero if you do not have these resources.

Advanced assumptions

Illustrative starting values, not confirmed grid or equipment conditions. Change these to match your actual agreement.

Example only: 60 min notice, 50 events/year, 12 h recovery. No equipment assumed until you add it.

Result

Indicative screening only. Assumes constant load and the event and equipment settings entered. Not a connection approval or Flex MOSAIC certification.

Send this scenario for a free review

How it is calculated

A transparent first-pass assessment.

  • Required reduction = site demand minus the event import limit, floored at zero.
  • Only count generation and approved flexible loads that can respond within the notice period and sustain the full event.
  • Limit battery discharge by its MW rating, usable MWh divided by event duration, and energy that can be restored before the next event.
  • Allocate sustained power in ascending variable cost until the required reduction is met or available resources are exhausted.
  • Calculate uncovered power, import during the event, annual event hours, recharge duration and annual modeled variable cost. Annual cost excludes capital and fixed costs.
  • The notice, duration and annual utilisation inputs follow the dimensions described in EPRI Flex MOSAIC. This tool does not assign an official flexibility class.

Your next step

Get a site-specific flexibility review

Share your scenario and site details. We will review the inputs and suggest the next step for your power plan.

Prefer to talk it through? Book a call

We use these details to reply to your request.