A flexible grid connection may let a data centre or industrial facility operate sooner by accepting defined limits on grid import. The practical question is whether the site can meet those limits without disrupting its protected operations.

GridPass Flexibility is an open-source engineering tool for that assessment. It is an independent alternative to the publicly described Flex MOSAIC evaluation workflow, with an inspectable model and explicit operating assumptions.

Model the connection before you invest

  • Assess how much grid capacity your facility needs and which restrictions it can accommodate.
  • Compare battery and generation capacity, cooling flexibility and workloads that can move to another time.
  • Evaluate equipment failures, recovery requirements and the conditions that make a proposed design infeasible.
  • Compare investment and operating costs with the value of an earlier grid connection.

A 20 MW peak within a 15 MW limit

The video shows a synthetic eight-hour example. Demand rises from 12 MW to 20 MW for two hours. The grid import limit remains 15 MW throughout.

A 3 MW / 8 MWh battery supplies 3 MW during the peak. A flexible workload moves another 2 MW to later hours. Together they cover the 5 MW gap.

Recovery matters too. The model completes the deferred work and restores the battery to its initial charge while keeping grid import within 15 MW. The example assumes an initially charged battery and work that can be delayed. It does not establish performance at a real facility.

Start with a screening assessment

Use the free calculator for an initial assessment. The open-source engine supports more detailed operating schedules, equipment comparisons and lifecycle economics. Its inputs, assumptions and source code are available for inspection.

For a real project, use the site demand profile, equipment limits and the network operator’s actual connection conditions. These determine whether flexibility is practical and what further engineering is required.

Bring a real site to the next step

We are looking for data centre operators, industrial consumers and grid operators interested in pilot projects. Start with a constrained site, its load data and the proposed connection conditions.

GridPass is an independent implementation. It does not claim EPRI affiliation, official equivalence or certification. Facility-specific validation remains necessary.

Try the free flexibility calculator

Sources

  1. GridPass Flexibility — open-source implementation and examples
  2. GridPass chronological model — assumptions and physical constraints
  3. EPRI — publicly described Flex MOSAIC framework and evaluation tool